🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: The plans below show a college café before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

Image for topic: The plans below show a college café before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.
Our system will evaluate the answer based on this AI-generated description.
The image displays two café floor plans. Plan 1, 'Café before redesign', shows a kitchen, a serving area for all food & drink, a general 'Tables and chairs' area, toilets, one bin, and two staff dining rooms, each containing 1 round table and 6 chairs. Plan 2, 'Café today', features a kitchen, a hot meals counter, a take away food counter, a coffee bar, a salad bar, a 'Tables and chairs' area, toilets, recycling bins, a barbecue, and an outdoor seating area with 4 tables and 20 chairs distributed as: one table with 4 chairs, two tables with 6 chairs each, and one table with 4 chairs.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The illustration demonstrates a college cafe before and after redesigning.

Overall, the building has undergone a notable development. Some of its areas were transformed to serve another needs for current moment. Also cafe’s territory expanded with an additional seating area outdoors with a barbecue zone.

In terms of inner parts of caffe, serving area in a kitchen, which was used for all types of dishes is used exclusively for hot meals today. Currently, a coffee bar has replaced a staff’s dining place and takeaway food is also situated there. A salad bar has appeared taking place along the left wall. Regarding the right side of the building, the only bin located in front of toilets was replaced by special recycling bins.

Moreover, the cafe’s territory has expanded in general. There have appeared three tables for six persons and two tables for four persons outside the café and barbecue zone was installed in the south west.

Word Count: 155

Answers On The Same Topic:

The plans below show a college café before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The plans illustrate a college cafe before its transformation and how it looks today. Overall, it is clear that a college cafe has undergone a significant redevelopment with a salad bar, a barbecue, and the outdoor seating being introduced. In the past, the cafe had a kitchen and serving area in the northwestern side. In […]

The plans below show a college café before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The layout illustrates how it was altered the college’s coffee house and how it looks today. Overall, several bars and a counter appeared instead of staff dining room. Guest’s area was enlarged,creating more space for customers and additional seating. Also these days there are outdoor seatings. Futhermore, they added a barbecue zone with recycling bins. […]

The plans below show a college café before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The illustration delineates the changes to a college cafe after renovation. It can be observed that the cafe has become more accomidation along with addition of food stalls. Initially,upon enter the cafe two private staff dining was present on the right side. Near the enterence, on the left side bines were provided and to the […]

The plans below show a college café before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The diagramm illustrates process by which college local cafe is manufacturing. Overall, the essential changings were on the kitchen and at the main room. Moreover, there added a lot of new furnitures on outside. The plan of the cafe was extended with outdoor seating and barbecue zones. Location of the toilet does not change. First […]

See All

Other Topics:

The plans below show the layout of a town called Sholeaton in 1985 and in 2015.

The two maps illustrate the layout of Sholeaton town in 1985 and 2015. Overall, the town became more convenient for residents by adding many public amenities and also transport infrastructure was improved for easier and safer accessibility. Regarding 1985, a swimming pool was located in the north, with a park in the north-west. In the […]

The maps below show the current layout of a school called Iftikhor and the proposed changes to the school site in the future.

The maps illustrate the current layout of the school called ”Iftikhor” and the future alterations, which will take place in the near future. Overall, the area of the school is planned to be greener and urbanized during the given period, particularly in terms of facilities and housing. It is also worth mentioning that, the river […]

The maps show a small theater in 2010, and the same theater in 2012.

The maps illustrate how much a particular theater has changed from 2010 to 2012. Overall, it is clear that the area underwent a dramatic transformation, becoming much more developed. The most notable changes include the conversion of media and stage, and the introduction of new restaurants and a shower area. Only exception for auditorium was […]

The two maps below show the changes in a town called Dalton from 1815 to 2015. Provide an overview of the information by identifying and describing the key details, and include comparisons where appropriate.

The two maps illustrate the town of dalton in the year 1815 and 2015. Overall, we can see that sweeping changes are planned for the area, including the deforestation in dalton forest. Starting with the most significant change, we can see most of the dalton forest was deforestated. They build home, hospital in the north, […]

The maps below show the changes to Hassleton-On-Sea from 1999 to 2016. Summarise the information by selecting and reporting the main features, and make comparison where relevant.

The maps illustrate changes that occurred to Hassleton-On-Sea from 1999 to 2016. Overall, Hassleton-On-Sea experienced massive reconstruction over the given period. Over 5 new buildings and beach facilities were constructed, and a large road change occurred in 2016. Harbour and Hassleton Pier remained relatively unchanged. On the one hand, large changes happened inland. Houses located […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.