The map illustrates area of school in 2004 and potential changes for this in next two decades.
Overall, there were just little changes, including adding new structure of school building, car park and road that leads to car park 2. The area of forest also somewhat dimineshed and bottom of the forest left almost unchanged.
In 2004, There were path that leads people to school buldings and sport field, but, major spot of this path has been replaced by combining school building 1 and school building 2 and in 2024, school building 3 constructed in the area which used to be sport field. This new school bulding made accessible to include 1000 students which was 600 in 2004.
Furthemore, sports field was build opposit to school building 3 across road with smaller capacity.Spot of main road, car park 1 and main entrance has not been cahnged over 20 years period, however in 2024 new road added beside of the school building 2 and car park 2 occupied place on the north side of the map next to school building 3.
