🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: The maps below give information about a plan to redevelop an industrial site. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

Image for topic: The maps below give information about a plan to redevelop an industrial site. Summarize the information by selecting and reporting the main features and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image depicts two maps comparing an industrial site's current layout with a redevelopment plan. The current site includes a parking area, a yard with seven office buildings and a canteen, a factory, storage, and an entrance with a reception, all bordered by Chimney Road, Toe Lane, Swallow Street, and Pile Walk. The redevelopment plan replaces the industrial buildings with residential housing, including three 3-bedroom houses, four 2-bedroom houses, one 4-bedroom house, communal gardens, a private road, private garages, a parking area, and an apartment building, all within the same street boundaries.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The provided graphs describe a renovation plan for an industrial premise. Generally, there will be striking transformations turning the whole area into an inhabitable space for dwellers.

To the East, the factory on Pie Walk Road will be demolished to make space for a block of apartments and with it, a parking area will also be constructed. To the North of the site, a series of 2-bedroom houses will replace the entrance and reception area. Private roads which are designed to be located on both sides of these houses, make it easier for residents to access the communal gardens in the center.

To the West of the plant, a block of 3- and 4-bedroom accommodations will be erected in replace of the parking lot on Toe Lane Street and a part of the storage on Swallow Street. Similarly, the office area will no longer exist yet new parking garages will be built there instead.

Word Count: 154

Answers On The Same Topic:

The maps below give information about a plan to redevelop an industrial site. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The two maps illustrate a plan to transform an industrial area into a residential site. Overall, it is clear that the industrial site is planned to be completely reconstructed, changing from a workplace with a factory and several offices into an area with houses and residential facilities, while the surrounding roads are expected to remain […]

The maps below give information about a plan to redevelop an industrial site. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The maps illustrate the current layout of an industrial zone as well as its redevelopment plan. Overall, this site will be transformed into a residential region in the future, with the addition of new accommodations, at the expense of a factory and offices. At present, there is an entrance and reception in the north, located […]

The maps below give information about a plan to redevelop an industrial site. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The maps illustrate the current layout of the industrial area, as well as displaying its proposed redevelopment plan. Overall, the industrial site will be significantly transformed in the future into an accommodation area, with the introduction of houses and other public facilities at the expense of offices and factories. With regard to the present layout, […]

The maps below give information about a plan to redevelop an industrial site. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The maps depict the comprehensive redevelopment of an industrial site into a modern residential neighborhood with improved infrastructure and amenities. Overall, the area will undergo a radical transformation, replacing industrial facilities with a meticulously planned housing community while preserving the existing road network. Internal roads will be introduced to enhance accessibility within the site. At […]

The maps below give information about a plan to redevelop an industrial site. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The plans illustrate the redevelopment of an industrial site into a modern residential area. Overall, the site is planned to become more resident-friendly with the addition of new housing and facilities. While most parts of the site will be transformed, the surrounding roads, including Chimney Road, Pie Walk, Toe Lane, and Swallow Street, will remain […]

See All

Other Topics:

The maps below show a bookstore in 2000 and now. Summaries the information by selecting and reporting the main features, and make comparisons where relevant. You should write at least 150 words.

The maps give information about the layout of a bookstore between two periods in 2000 and now. Overall, travel,new books and service desk remained unchanged between the given period. However, coming to the fiction zone, this structure was completely changed. Regarding 2000, there were two big fiction area. Additionally, travel, new books and service were […]

The diagram shows Rampart street today and the plan for changes to the street in 2035. Summarise the information by selecting and reporting the main features, and make comparisons where relevant

This maps illustrates Rampart street today and the plan for changes to the street in 2035 Overall, the area became more developed, with several new buildings and roads being added. We see the road for cars will be converted into a pedestrian path. Also some buildings disappeared and new facilities will introduce. Firstly, at present […]

The maps below show information about the change of Riverage college 30 years ago and now.

The two given maps illustrate the transformations that have taken place in a college named Riverage between 30 years ago and the present time. What is most striking when looking at the maps is that the college has witnessed substantial modifications, with the most notable being the appearance of recreational, academic amenities and green space, […]

The diagram shows the map of a University Sports Centre in 2007 and at present. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The map clearly illustrates the change that has taken place in the university sports centre between 2007 and the present. Overall, the sports centre has gone through several redevelopments. The centre now features a range of new facilities, with many original features being replaced and removed. The majority of the change has occurred in the […]

Summarize the information by selecting and reporting the main features and, make comparison where relevant

The maps show how Grange Park changed from 1920 to the present day. Overall, it is clear that the park has changed a lot. Some original features, such as the rose gardens and seats, still remain, but the stage, fountain, glasshouse and pond have been removed. Several new facilities have also been added, including a […]

The plans below show a public park when it first opened in 1920 and the same park today.

The given schemes depict the Grange park on the Eldon and Arnold streets in 1920 and how it looks today after more than 100 years. Overall, what stands out from the layout is that the area has been modernised significantly, becoming more attractive for visitors. The rose garden has remained in the same place. In […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.