The two maps depict the plan for the development of a school layout over a period of twenty years, from 2004 to 2024.
Overall, it is evident that hardly will there be any changes to the natural areas of the school site. Additionally, it is also noticeable that there will be the construction of several new buildings in the school.
Looking at the information in more detail, in 2004 there were only two school buildings which were parallel through a path straightened to a sports field. In the following 20 years, there will be an installment of the third school building in a place which used to be the sports field. Therefore, the number of students accommodated has risen from 600 to 1000 students. The sports field will then be smaller and relocated to an area which is not far from there.
Moving to the left, the main entrance, road, and the car park remain intact over the period shown. Similarly, the forestry areas in the top and the bottom of the school are anticipated to see few changes. Notwithstanding, a new road will be introduced which leads to the second car park situated beside the third school building.
