The maps illustrate the changes in a small theater between 2010 and 2012.
Overall, after two years, the theater became noticeably larger with the expansion of its upper and lower sections. The center section still remained.
Regarding the top of the map, the stage was extended to the North, taking up half of the space previously occupied by the media room in 2010, which two years later was converted into a hall. The auditorium in the middle still remained. The old media room and storage room had been moved to the upper left and right respectively. In addition, new showers area was built next to the media room.
Turning to the lower section, the café was located in the bottom right corner of the map next to the main entrance in 2010. Opposite the café was a ticket office and admin office on the other side. However, in the next 2 years, the ticket office was removed to the lower right corner, where the café had been. While the admin office was relocated to back to make way for a new restaurant area.
