Our system will evaluate the answer based on this AI-generated description.
The image shows the floor plans for Southwest Airport before and after development. The "Now" plan has a central rectangle, with four zones marked 1-4 in the upper half and zones 5-7 below; 1 is 'Check-in', 2 'Café', 3 'Toilets', 4 'Shop', 5 & 6 'Gates', and 7 'Arrivals'. Two lower corners display 'Departures' and 'Security'. The "After Development" plan has additional zones marked 8-18, rearranges existing zones, and incorporates curved extensions on three sides. Upper half displays 8 'Café', 9 'Toilets', 10 'Shop', 11 'Gates', 12 'Toilets', 13 'Gates', and 14 is a new zone 'ATM'. Lower half has 15 'Shop', 16 'Toilets', 17 'Café', and 18 'Car hire'. The central rectangle holds 'Departures' and 'Security', while 'Arrivals' moves to a new location, and 'Check-in' remains unchanged.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
We can acknowledge the before and after renovation schematics of selected part of an airport.
Overall, latest airport has more services to provide travellers and increased number of gate.
Firstly bag drop is added in departures is more time convenient for many passengers because its just before the passport control also similarly for the arriving passangers new services such as ATM to quickly exchange or deposit cash and Car hiring is right after the passport control.
Secondly enlarged space of the airport also increased the number of gates to 8 to 18 this will create flexible and comfortablity for both passengers and flight crew, also before the renovation there was an walkway but now there is Sky train to carry people to the gates effortlessly and quickly.
Word Count: 127