The two maps show how a healthcare centre has changed between 2005 and the present day.
Overall, the building has undergone significant expansion, particularly in terms of infrastructure and parking capacity. The layout has been reorganized, with several rooms relocated or replaced, and new facilities introduced.
In 2005, the entrance was located in the south and led directly into a hallway with seats on both sides, eventually reaching the reception area. As of now, the entrance has been moved to the southwest corner, with the reception desk placed directly beside it. The third consultation room has been removed to accommodate this change, as well as to make space for a children’s play area.
The eastern part of the building has remained relatively unchanged. However, two new consultation rooms have been added in the area that formerly contained the main entrance. Some existing rooms have been reduced in size to allow for a wider hallway. In addition, a minor operations room has been constructed to the left of the physiotherapy room.
Regarding external changes, the parking area has expanded from 12 to 30 spaces. The railway line, which used to run from the southwest to the south of the site, has been reoriented and now runs vertically from north to south.