The map demonstrates the structural developments and transformation of a health center in 2005 and in the current day.
Generally, it is clear that the health center witnessed a significant modernization with the most noticeable being the addition of several new facilities such as minor operations room, … and the relocation of CR1, CR2, CR3. In 2005, the health center is quite small and simple, with less amenity.
There was a reception desk at the middle of the place and seats were put surrounding. A entrance was located at the south, while the physiotherapy room was built at the northwest corner. The office was construct at the left side and CR3( Car Parking) was built below it. At the right side of the center, there was a CR1 and a CR2 which was demolished above the CR1 and there was a garden surrounding the center.
Today, the center has been considerably modernized. The physiotherapy room still set up at the same position while CR1, CR2, CR3 were changed to the new position. Moreover, the addition of minor operations room, children’s play area and CR4. The minor operations room was constructed at the northeast corner and next to the left of physiotherapy rooms. Beside, the reception desk was adjusted to the southeast direction with a little bit distance and the children’s play area was demolished next to it. The entrance was moving to the left side and the office is still the same.
