🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: Summarise the information by selective and reporting the main features, and make comparisons where relevant.

Image for topic: Summarise the information by selective and reporting the main features, and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image presents two maps of Porth Harbour, one from 2000 and one from today. In 2000, the layout included a Main Road to the west with access to: a northern section containing Showers & toilets, a Car park, and a Marina for private yachts; and a southern section with another Car park and a Fishing boats area. A road along the southern shore led past a Lifeboat station to a disused Castle on a peninsula, which had a Public beach. The harbour itself contained a Dock, a Passenger ferries area, and another Public beach to the north. In the map for today, the northern section west of the Main Road now has Showers & toilets, a Car park, and the Fishing boats area; south of this are a new Showers & toilets facility, the original southern Car park, and the relocated Marina for private yachts. The southern road now features Cafes & shops, the Lifeboat station, and a Hotel which has replaced the castle; the adjacent beach is now a Private beach for the hotel. The Dock has been enlarged, while the northern Public beach and Passenger ferries area remain.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The plans below illustrate a harbour in 2000 and how it has transformed nowadays.

Overall, it can be seen that after two decades significant modernisation has taken place with several buildings have been built.

There were a dock,two passenger ferries and a public beach in the northern part of plan in 2000.Later, a harbour and passenger boat have been added after a period of time,while public beach remained unchanged.Initially, the southern part of the island contained some buildings such as lifeboat,road,public beach and disused castle.Cafes and shops have been constructed near the unchanged lifeboat.The abandoned castle was demolished to make way for a hotel,therefore the road has been extended to the hotel.The public beach has been altered to private beach for the hotel.

The western part featured a main road, two car parks,showers and toilets, marina for private yachts and fishing boats in 2000.Today,showers and toilets have been introduced near the car park,thus main road is linked with it.Fishing boats and marina for private yachts have swapped places.

Word Count: 168

Answers On The Same Topic:

Summarise the information by selective and reporting the main features, and make comparisons where relevant.

Porth Harbour in 2000 looks a lot different from Porth harbour today as clearly there were some adjustments made throughout out the years. Porth harbour in 2000 offered two public beaches where one is located in the north shore and the second beach is located in the south shore beside the castle, there was also […]

Summarise the information by selective and reporting the main features, and make comparisons where relevant.

Porth Harbour in 2000 looks a lot different from Porth harbour today as clearly there were some adjustments made throughout out the years. Porth harbour in 2000 offered two public beaches where one is located in the north shore and the second beach is located in the south shore beside the castle, there was also […]

Summarise the information by selective and reporting the main features, and make comparisons where relevant.

The maps compare the layout of a port between 2000 and present day. In general, the harbour has been completely transformed, most notably with the addition of new transportation and tourist facilities. In the left-hand side of the maps, there is a main road running from north to south, east of which a car part […]

See All

Other Topics:

The plans below show a public park when it first opened in 1920 and the same park today.

The two maps illustrate a public park in 1920 and the present image of this park. Overall, it is evident that the park is updated with a lot of modern facilities such as, cafe, children’s play area, amphitheatre for concert whereas in the this park was simple public place. From the first map in 1920, […]

The plans below show a small park in 1980 and the park now.

the cognizance pertaining the present infratructure of park comparison with 1980, has been elucidated by map. Overall , after scrutinizing the information it caan bee inferred that the most reliable convinences are provide such as tables , barbecue and free area for play .Moreover, the crossing section to north and south make easy to walk. […]

the maps below show the changes in the art gallery's ground floor in 2005 and the present day. Summarize the information by selecting th main features, and make comparisons.

The tow maps illustrated the major changes that took place in the Art gallerys ground floor in 2005 and today. Overall, looking from an overall perspefctive, the ground floor has become much more developed with significant facilites. During the years the area was saw dramatical changes. According to the map, in 2005, the enterance led […]

The maps show a present layout of an office building and plans for its future redevelopment.

The maps show the current layout of an office building and the proposed changes for its redevelopment. Overall, the office building will be significantly changed in the future. The main changes will be the removal of the kitchen and canteen, the addition of more offices, and the creation of an outdoor seating area and a […]

The two plans below show how the ground floor of a flat has changed over a decade. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The floor plans below compare the layout of a flat’s ground floor as it was 10 years ago with its presnet-day arrangement. Overall, the flat has undergone a few reconfiguration over a decade. The most notable changes include the total removal of childen’s play area, cloth store and flower shop, alongside the introduction of new […]

The maps below shows changes in the city of nelson in recent times.

The map clearly illustrates how the city of Nelson developed over 26 years. Overall, the city was converted into a more modern area with additional commercial facilities and infrastructure. In 2000, Nelson was relatively undeveloped, with only a limited number of buildings and services. On the northern part of the city were the university and […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.