24 Hours Only: Get 39% OFF on Our Premium Plan - Check Out Now!
Map

Band 5+: Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

Image for topic: Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image shows two maps depicting Norbiton industrial area currently and its planned future development; the current map features a central roundabout with junctions leading to a factory southeast, additionally spread-out factories are throughout, with farmland northeast, two branching roads, and empty land near the central roundabout; the future development map shows central roundabout additions including exits north to school, east to playground, and west to housing; the existing factory south converts to a medical center; additional junctions and roundabouts extend to housing to the south and east, shops northwest, school north, playground east, medical center south, and farmland transforming into housing in the northeast.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The New Design of the industrial area for the future is planned in the town of Norbiton in the given maps. The expansion of the region depicts that industrial sector will be replaced by residential area, moreover some facilities including school, playground, hospital are also added for convenience.

Firstly, industrial units are substituted with local housing and some facilities, like in the east a school will be built. In between the two housing units, development of a garden is planned for people. The medical center and the shops are opposite each other and separated by a previously built road.

Secondly, the newly constructed bridge over the river and the road facing north for better connectivity towards the farmland where a hosing residency is also planned. While the areas in the west and some of the farmland will remain same but one new roundabout will be built on the existing road which is parallel to the river.

Word Count: 156

Answers On The Same Topic:

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The map above illustrates an industrial area in the town of Norbiton from the present to the future plan of refurbishment that will happen. Overall, the map indicates that the future development will expand the roads and the amenities around town. From the map of the present, it shows the road by the lake is […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The two maps illustrate the industrial region of Norbiton town, as it is now and the development plans for the future. Overall, it can be observed that industrial site will be replaced with housing area and redevelopment of some amenities, such as shops, a medical centre, a playground, and a school for public convenience. Currently, […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The figures illustrate a Norbition undustrial site now and its forthcoming changes. Overall, the area is planned to have factories replaced with housings. Moreover, it may be expected to turn into a place full of new facilities for people. Now, the industrial area has two main roads connected in the center of the town. There […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The two maps depict the town of Norbiton industrial area at present, and proposed future plan for improvement. Overall, industrial buildings will be expected to change houses. It can be seen from the maps, several facilities will be offered to build like recreational area, educational center and the infrastructure of the city will be developed. […]

See All

Other Topics:

The two blueprints provided show the development that has taken place in a library between 1975 and the present

The two maps compare the layout of a library in 1975 and in present. Overall, the library has experienced a notable modernization, alternating its main appearance for the benefit of becoming more visitor-friendly. This transformation included the supplantation of multiple sites such as bookshelves and shared areas; the southern side, however, stayed untouched. Firstly, it […]

The maps below an industrial area in the town of Norbiton, and planned future development of the site.

The diagram below illustrates an upcoming development plan in a industralized area in the town of Norbiton. Currently, the area is equipped with 8 industrial buildings, a roundabout, and two roadways connected to the roundabout. On the left-hand side of the area is where the town is located. .There is also an isolated farmland in […]

The map below shows the plan of a proposed new town. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The map illustrates a new building plan for a town. Overall, most of the town is used to construct housing, surrounding ring roads which are shaped in ellipse. The center is a compound of bus stands, parking areas, and recreational areas, while two vast industries are located in the Northwest and Southeast of the town. […]

The maps below show an island in 1980 ans as it looks today.

The diagram provides information about an island transformation in 1980 and at present. It includes label for the footpath and vehicle track. Generally, it is notable that in the initial year, the island had a lot of trees and no houses built, whereas today various establishments were founded. In 1980, there were no footpath and […]

The maps show Pacific Railway Station station in 1998 and now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

These two maps below illustrate pacific railway stations in two different years. According to the maps, it gives information about numerous changes in reconstruction in 1998 and these days, shops and a new platform is added to the station. In 1998, two platforms were built next to toilets on the right-hand side. However, in 2026 […]

The diagram below shows the present and planned development in the biomedical campus of a university. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The given sketch illustrates both the current and the ultimate design of the biomedical university’s campus. Overall, the campus changes significantly in the new layout. Some are reorganised, others will have new facilities added. In the northern part of the campus, on the left side, there are some changes due to the redevelopment of new […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible and free for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
1000+ IELTS Tests & Samples
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & Content
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
279,000₫ 157,000 ₫ cho gói 1 tháng (chỉ 5,233₫/ngày)
819,000₫ 397,000 ₫ cho gói 3 tháng (chỉ 4,411₫/ngày)
1,649,000₫ 667,000 ₫ cho gói 6 tháng (chỉ 3,706₫/ngày)
3,299,000₫ 857,000 ₫ cho gói 12 tháng (chỉ 2,381₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.