The given maps depict the current structure along with the future proposal of an office building.
Overall, it can be explicitly seen that there are several changes that have been introduced for the future office building, but the most noticeable are the removal of grass, replacement of kitchen and canteen with new sections and a new meeting area.
Delving deeper into the gieven data, it is crystal clear that the grass on the left is replaced by outdoor sitting area, while on the other side WCs and meeting area will be constructed on the grass along with some chairs. Furthermore, the entrance is proposed to be shifted in the centre of the building. While, now the building has four offices near the entrance, in the upcoming time there will be only two offices near the entrance.
Looking at further details, when it comes to the kitchen and canteen area, it is suggested to be replaced by office zone. Moving forward, the storeroom as well as the entrance in the centre of the office will remain same, however near the storeroom, a coffee machine is installed by replacing the current WCs region.
