The illustration describes the current layout of an office building and its proposed refurbishment.
Overall, the infrastructure is planned to undergo considerable shifts, notable with the cut-off of green space, the relocation, and introduction of several facilities.
In the future plan, there will be no green area on both sides of the building. Instead, a new outdoor seating area and a meeting section are expected to be installed on the left and right, respectively, both paired with several chairs for the staffs. Nearby that, restroom is predicted to be relocated to the top right corner.
Entering the structure, small-sized office rooms will be connected to larger ones for multiple purposes, put surrounded the entrance. A fair distribution of these is true with two will be built next to a storeroom, which is space for kitchen and canteen. To compensate for that loss, a coffee machine will be installed in the midst of the toilet and storeroom
