The maps portray structure of town at present along with future predictions.
In general, from an overall perspective, proposed plan have major transformation to connect areas with roadways, and industrial sites will be present. However, significant parts would remain untouched.
At present, western wing is covered with roundabout A2 and airfield at northwest corner, which is directly leading towards town centre situated at eastern area, including built-up area ring road adjacent to it. While railway is constructed at the central part with gas station at middle of the south.
In case of proposed plan, industrial area will take place of airfield connecting either side with railway and roundabout A2 at west, which will connect town centre with another route A4 and newly added roundabout at heart of the map. However, town centre will attached with highway on the east zone.
