The diagrams illustrate how Hunderstone town will develop in the future.
Overall, the area will undergo a number of dramatic changes, the most important of which is the construction of road systems, while some main amenities will remain unchanged.
Looking at the eastern area, a huge main road will be constructed from the town center in order to connect the whole area toward outside. Another change is that a roundabout will be built at the intersection of the railway and the roadway, which was accompanied by the erection of A4 road in the southeast , connecting directly the A2 road, the railway and the build-up area ring road.
In the north, there is a forecast that the air field will be transformed to an industrial estate, with the extension of the nearby road. The most significant feature is that the town center, the build-up area ring road and the gas station will be predicted to be untouched.