The image illustrates a linear sequence titled 'Manufacturing to Using' for creating a storage area with concrete canvas, involving eight distinct stages: (1) Manufacturing, where dry concrete mix is encapsulated inside a layer allowing water passage and a waterproof polymer; (2) Delivering, using a truck to transport the packaged canvas; (3) Unwrapping, preparing canvas rolls up to 10 meters in length; (4) Unfolding, placing the unwrapped canvas on the ground; (5) Inflating via air pump, forming a semi-circular shape between 2 to 3 meters in height; (6) Hydrating, by adding water to the inflated canvas; (7) Setting, where the structure solidifies within 12 to 24 hours; (8) Using, depicting the completed and functional storage space. There are no numerical data points or percentages beyond those related to dimensions, time, and volume description in each step.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The diagram below represent a process of how a storage is made from a canvas that contains concreat and water.
Overall, there are 8 major steps in the procedure of producing a storage space from concreat canvas, beginning with manufacturing and ending with using.
Firstly, the concreat canvas was manufactured by adhering 3 layers together with top layer that allow water to pass through, the middle layer included dry concreat fiber and the bottom was a watertight paste. Secondly, the packet with concreat canvas was delivers to the customers. Before unwrapping, the concreat was only 1 meters, then it was expanded to 10 meters by pegs and rope. After that, the concreat canvas was put on the ground and pumped the air into until it reached 2.5 meters height to prepare for using.
In addition, the next stages is hydrating the concreat canvas by using hosepipe to pour water to the surface. The second last steps are waiting from 20 to 24 hours for the concreat setting before the final step that it is used as a storage zone.