The provided map represents the differences between lake side in 2000 and that in 2009 after developing.
Overall, what stands out from the map is that the lake side was extensively renovated with some additions and replacements of infrastructure. The most striking change is that a woodland was contracted to make room for and expansion of industrial complex.
Firstly, in 2000, the woodland was the largest among other places shown in the map, expanding along the east side of the map but in next nine years, over a half of this area in the corner was utilized to expand the scale of industrial complex, with a fourfold increase in its size. Besides that, a lake starting from the nearest left corner to the woodland became a pond in 2009. There was a river flowing towards the lake and pond in both years.
Moreover, taking a closer look at the map, the number of residential areas decreased from three areas to only one in 2009 with the area in the farthest left corner stayed in the same position while the area with the same size was replaced with shopping centre. In 2009, the land for arts centre below the residential area was used for construction of multi-screen cinema while the old town was changed into offices with a new design facilitating the appearance of new university beside a unchanged school.
