The maps show how school environment looked in 2004 and how it will look in 2030.
Overall, it is clear that school site will experience extensive developments with regard to the construction of new school building and new car park with relocation in sports field. However, these developments will come at the expense of a part of woodland.
In 2004, school campus was compact and catered for 600 students. A main road led to car park and principal entrance. Campus contained two main buildings: building 1 located in south-west side and building 2 was in the opposite. They were separated with pedestrian path which linked sports field to main entrance. And main area largely occupied by woodland.
By 2030, considerable changes are planned. A third new building will be constructed to increase the students number by 400. School building first and second will be physically connected and pedestrian path will be redesigned to connect all three buildings rather than running directly from the entrance to the sports field. A part of woodland in the south-east will be removed to build new car park and a new road will be constructed along the southern edge of the building 2, to improve internal access.
