The image contains two school site in 2004 and 2024. The total land size remains the same, however, the students have increased from 600 to 1000.
In 2004, the sections showed in the image includes 1 car park, 1 main entrance, 2 school buildings, 1 sport field,a path connecting main entrance to the sport field, 2 forests and a road seperating the site. The plan for 2024 is to reduce 1 forest and cut the length of the road. However, the diagram shows they are adding 1 school building, 1 car park. After construction, the road will go through the new car park and sport field instead of turning its direction. As for the path, originally linking the main entrance and the sport field, will be connecting 3 school buildings.
While some of the section remains, the sizes are slightly changed. Car park and the main entrance that existed since 2004 will be unchanged. School building 1 and 2, as well as the forest will be reduced for approximately 10%. In 2024, an area as larger as the new sport field will be unconstructed in the corner of the campus.