The diagram demonstates the key changes in the plan of a particular school site from 2004 to 2024.Overall, major changes can be observed in the connectivity of school bulding 1 with the school building 2, which are further connected to a newly added school bulding 3 through a common pathway, and an additional car parking space can also be observed.
In 2004, a car park is placed right along the road which is followed by a main entrance to the school building and the same road follows as you turn right. It can be observed that the school building 1 and 2 are separated by a pathway that connects the main entrance to the sport field which is separated from the forest by the road.
In 2024, Despite the addition of a new school buliding 3 and a second car park on the right hand side, there are no changes in the positioning of the road, the car park, the larger forest and the main entrance. The school building 1,2 and 3 are connected through a pathway whereas there was no connection between the school building 1 and 2 in 2004. Lastly, the sport field is shifted to the other side of the road beside the forest
