The above diagram depicts a site of a school in 2004 and the plan changes to the school site in 2024. School has been equipped with an increase in capacity of students from 600 students to 1000 students over the period of 20 years.
In the year of 2004, the site of the school had a road navigating beside a huge forest on the right side and straight ahead is the car park ahead along with the main entrance. There was a path connecting the main entrance to the sports field, and as you go through it, you could see both school buildings on each side. However, that path was not connected to either of the school buildings. In addiition, there was a narrow forest area behind the sports field.You could navigate through all of it by road as it passes through each building, making sure you have good access.
20 years later, the site of school was met with necessary changes needed with time. The entry remained the same as before, but as you pass the main entrance, now the path was connected to every school building, infact an additional school building as added to the site where the sports field used to be. A car park adjacent to the third school building was also added since the capacity of students and staff was increased. The sports field was shifted to opposite site of the school building adjacent to the huge forest. Connectivity was still maintained well according to the needs of everyone.
