8 report(s) found.
The image contains two school site in 2004 and 2024. The total land size remains the same, however, the students have increased from 600 to 1000. In 2004, the sections showed in the image includes 1 car park, 1 main entrance, 2 school buildings, 1 sport field,a path connecting main entrance to the sport field, […]
This diagram illustrates the changes that have occurred at the school site over the past 20 years. Overall, there have been significant differences during this time. Firstly, the number of students increased from 600 to 1,000. In 2004, there was a sports field located behind the school buildings, but by 2024, the sports field is […]
The map illustrates changes which took place in a school site over a-twenty period ,commencing in 2004 Overall, this school has underwent a major change , with a demolition of natural resource and addition facilitates to adapt the population There was a forest located to the west of the map which has been destroyed and […]
The given maps illustrate the difference in the site of a school between 2004 and 2024. Overall, the school site underwent numerous transformations, with the addition of many new facilities. In 2004, it can be seen that the car park and main entrance were located at the upper left corner of the map, linked to […]
The maps illustrate the layout of a school site in 2004 and its proposed changes over the next 20 years. Overall, the area is projected to undergo several changes, the most prominent of which is the addition of a school building and a car park at the expense of the green space, catering for an […]
The maps illustrate the school in the year 2004 and future changes 20 years later. Overall, the area of the school was projected to undergo several changes as extra school-building facilities and the car park were added at the expense of the green zones, catering to an increased number of students in the given period […]
The maps give the illustration of the school in the year of 2004 and future changes 20 year later. Overall, the area of the schools was projected to undergo several changes as extra school-building facilities and the car park at the expense of the green zones, catering the an increased number of students in given […]
The maps illustrate the layout of a school site in 2004 and its proposed changes over the next 20 years. Overall, the area is projected to undergo several changes, the most prominent of which is the addition of a school building and a car park at the expense of the green space, catering for an […]
