The maps illustrate the layout of a school site in 2004 and its proposed changes over the next 20 years.
Overall, the area is projected to undergo several changes, the most prominent of which is the addition of a school building and a car park at the expense of the green space, catering for an increase in the number of students.
In 2004, the school had 600 students. In the west of the school site, there was a roadway leading northwards to a car park and a main entrance. The main entrance was connected by a path to a sports field, while on either side of the path were two school buildings. Meanwhile, a huge part of the south and east of the site was occupied by forest.
In 2024, some changes are predicted to be made regarding education and transportation facilities, allowing 400 more students to be added. Specifically, the sports field will be relocated to the east of the school site, making space for a third school building to be built, along with the construction of a second car park next to it at the cost of the forest. Moreover, all three school buildings will be accessible via the path. However, the existing car park, the main entrance, and the forest in the south are anticipated to remain unchanged.
