Two maps illustrate part of school in 2004 and changes to be made in 2024.
In general, the school is expecting to have minor transmission, yet enlarging own territory to educate more students. Furthermore, school’s green space will have the same coverage as it used to be.
In 2004, there was a road led to sole car park and main entrance of school. Two school campus were located along the path which was connected to a road. In addition, a huge sports field ended the path in eastern part of school. The forest bordered with whole infrastructure in the center and south-eastern site of the school. Interesting to note that in 2004 600 students were taught in the school.
Two decades later following adjustments will be seen. Firstly, third school block will be built with second car park neighboring it on east. Both of them will reposition sports field. Secondly, a latter place will change its location and size. In other words, this field is about to be under its original position and be smaller than its past size. Thirdly, a path is going to be shorter allowing first and second school buildings be connected. As for a road, it will stretch till car park 2, yet touching nearly all buildings. Lastly, 400 more pupils are expected to get education there in 2024.
