🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 4+: The map below show an industrial area in the town of Norbiton, and planned future debvelopment of the site

Image for topic: The map below show an industrial area in the town of Norbiton, and planned future debvelopment of the site
Our system will evaluate the answer based on this AI-generated description.
The image shows two maps representing the Norbiton industrial area now and the planned future development. Both maps have a river on top, farmland to the right, and a town to the left. In the current map, there's a factory area with six units in a cul-de-sac layout, while the future development includes additional housing, a playground, roads connecting the existing factory units, and planned future factory units. There is no numerical data provided.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The maps compare an industrial area in the Norbiton city, and future vision development of this town.

It is clear that, todays, the buildings are located in limit areas and they are concentrated, but in the planned future, the city will be more extended and industrial area will be changed to the residential place and factories will be despaired.

Precisely, nowadays, the factories are located around the one square and one street, in the east of the square the five factories can be seen and other factories are around the square, all of the buildings are in south of the river. However, in future, in east of the central square some new places will be built, such as playground and school, also instead of factories, housings will be built.

The other interesting point is that in planned future development a new bridge will be built on the river and a big housing will be located, also in south- west and south- east, shops and medical center will be built respectively.

Word Count: 170

Answers On The Same Topic:

The map below show an industrial area in the town of Norbiton, and planned future debvelopment of the site

The maps illustrate the current layout of an industrial area in Norbiton and the proposed plans for its future development. Overall, it is manifest that the site is slated to be transformed from an industrial zone into a fully developed residential area. The most prominent change involves the complete demolition of all factories, which will […]

The map below show an industrial area in the town of Norbiton, and planned future debvelopment of the site

The given maps compare the current industrial layout of Norbiton town with its planned future development. Overall, Norbiton is expected to change from an industrial area into a more residential town, with most factories being replaced by housing and new public facilities. At present, there are several factories located around the town, while farmland and […]

The map below show an industrial area in the town of Norbiton, and planned future debvelopment of the site

The two diagrams present the current configuration of an industrial zone in Norbiton and a proposed redevelopment scheme for the same location. Overall, the area is set to undergo a comprehensive transformation, shifting from a factory-dominated landscape into a residential district featuring civic amenities such as a school, medical centre, and recreational facilities. At present, […]

The map below show an industrial area in the town of Norbiton, and planned future debvelopment of the site

The plan illustrates a comparison between the existing layout of the Norbiton industrial area and its future development. Overall, it is clear that the current industrial area lacks modern facilities, which are expected to be introduced in the proposed redevelopment. The most noticeable change is the removal of factories, which have been replaced with housing, […]

The map below show an industrial area in the town of Norbiton, and planned future debvelopment of the site

The two maps show how an industrial area in the town of Norbiton will be developed in the future. Overall, the area is set for a major transformation from an industrial zone into a residential area, with addition of public facilities and improved infrastructures. In the present map, the area mainly consists of factories around […]

See All

Other Topics:

Summarize the changes in the Layout of the Woodwards University in 1985 and now

The maps depict how the layout of the Woodwards University has been changed between 1985 and the present day. Overall, the layout has undergone substantial transformations, the most of which include a big replacement of car park with a shuttle bus terminal, the disappearance of biology block, and the expansion of admin building and library. […]

the plans below show a small theatre in 2010,and the same theatre in 2012

The plans shows how the layout of a theatre changed between 2012 and 2012. Overall, the theatre underwent significant redevelopment, with its top and bottom parts being expanded. Additionally, a few features remained intact, while the remainder were either relocated or removed. In 2012, the theatre had a simpler layout, heart of the building the […]

The map shows the centre of Paris. A company wants to open a new restaurant in the area. The map shows two possible locations for the restaurant. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

There are two possible locations which are shown on the map for opening the restaurant in Paris. Overall, location 1 is situated on the Right Bank, near the Maritime Museum and the Aquarium, whereas Location 2 is placed on the Left Bank which has the advantages from being close to the Eiffel Tower and Art […]

The map shows the centre of Paris. A company wants to open a new restaurant in the area. The map shows two possible locations for the restaurant. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

Overall, Location 1 is on the right bank of the River Seine, while Location 2 is on the left bank. Location 1 is close to the Maritime Museum and a park, while Location 2 is near the Eiffel Tower and an art gallery. Also both locations have some tourist places and bridges nearby. Location 1 […]

The maps below show the layout of a public park when it first opened in 2000 and how it looks now in 2024. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps illustrate the changes in the layout of a public park between 2000, when it first opened, and 2024, the present time. Overall, the park has been significantly developed with more facilities, better landscaping, and improved arrangements for visitors. In 2000, the main-entrance was at the north, leading directly into the park. A […]

The maps below show the Village of Westfield in 1990 and at the present time. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The given maps illustrate the layout of Village of Westfield in 1990 and the changes that have been applied until now. Overall, new Village of Westfield is made up of more facilities than the old one, such as playground, school, supermarket. In addition, some part of the village has also been transformed. In 1990, the […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.