🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 5+: The maps below show an industrial area in the town of Norbiton, and planned future development of the site

Image for topic: The maps below show an industrial area in the town of Norbiton, and planned future development of the site
Our system will evaluate the answer based on this AI-generated description.
The image contains two maps of an industrial area in the town of Norbiton, showing the current layout and planned future development. The first map depicts the area as it is now, with a river running horizontally across the top, farmland to the north of the river, and a main road labeled as "Town | | Sea" running vertically down the middle. To the east of the road, there are five rectangular industrial buildings arranged in a row, and to the west of the road, there is a larger, circular building labeled as "Factory." In the second map, the future development plan shows the river and farmland in the same positions, but the industrial buildings have been replaced by a circular arrangement of five buildings around a central roundabout, with an additional building to the east. The factory remains in the same location, but there is now a "Playground" to its west, and a residential area labeled as "Housing" has been added to the southwest corner of the map. The road labeled "Town | | Sea" is still present, but it now curves around the new building arrangement.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The given maps illustrate an industrial region in Norbiton, and planned future innovation of the area.

Overall, there are many changes in the future plam. More housing and services buildings might be built in order to replace current factories.

Looking at the images more closely, running from the west to the east of the town, a river and a farmland up to the north, and a main road down to the south will be kept according to the plan. Besides, a roundabout at the centre of the town might also remain stagnant.

Recently, the roundabout leads to two different directions, one connects to the main road and another one directs to the east. In addition, there are eight factories surrounding the roundabout and easten road.

In the future plan, the singled-roundabout will turn into doubled-one. Moreover, instead of two road directions, there might be two more: one leads to the west and the last one heads across the river. Additionally, seven houses, shops, medical centre, playground, and school will be constructed to take over the places of current factories.

Word Count: 179

Answers On The Same Topic:

The maps below show an industrial area in the town of Norbiton, and planned future development of the site

The two maps illustrate the current industrial area of Norbiton and the proposed future development of the site. Overall, the area is planned to be transformed from a largely industrial zone into a residential neighbourhood with community facilities, shops, and infrastructure improvements. At present, the site is dominated by factories arranged around a central roundabout, […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site

The diagrams compare the current layout of an industrial area in Norbiton city with its proposed development. Several modifications are planned, the most noticeable being the removal of eight factories, the expansion of roads, the addition of housing along with supporting facilities such as shops, a medical centre, a school, and a playground, as well […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site

The maps illustrate the current layout of the industrial area in the town of Norbiton and the proposed plans for its future. Overall, it is immediately apparent that the industrial area is expected to become more developed and modernized, with an increased number of public facilities. Currently the presented area consists mainly of factories, which […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site

The map details how the town called Norbiton will develop over the next few years. Overall, it is readily apparent that this town will become more accessible and residential with new roads and housing facilities, educational with a new school, commercial with a medical center and shops, and more entertaining with a playground. These changes […]

The maps below show an industrial area in the town of Norbiton, and planned future development of the site

the diagram depicts the differences between the current Norbion’s industrial area and the future map of the town which is planned to undergo several developments. Overall, there is road enlargement plans along with the construction of bridge and roadloop. This is followed with the replacement of factories with residence and the construction of several public […]

See All

Other Topics:

The two maps below show the changes in a town called Dalton from 1815 to 2015. Provide an overview of the information by identifying and describing the key details, and include comparisons where appropriate.

The two maps illustrate how the town of Dalton was transformed between 1815 and 2015, evolving from a small rural settlement into a fully developed town. Overall, the most significant changes were the almost complete disappearance of Dalton Forest, the construction of a bridge linking the two banks of the River Dal, and the introduction […]

The maps below show a town centre in 1990 and the same town today.

The two maps illustrate the development of Town Centre, highlighting the key changes that occurred between 1990 and today. Overall, it is clear that the area underwent significant redevelopment, with several facilities being introduced and existing features being repurposed. Looking at the details, in the southern and southeastern side of the area, the houses were […]

The maps below show changes in the city of Nelson in recent times. Summaries the information by selecting and reporting the main features, and make comparisons where relevant.

The charts illustrates the difference of city Nelson in 2000 and today. Overall, the city has undergo considerably developed by constructing more buldings. Despite the modernization, the area has become residental. In 2000, most of the space in the city was empty, especially the port that occupied large free area. There was the road for […]

The maps below show some of the changes that have taken place in Duban in recent decades. Summarize the information by selecting the main features, and make comparisons. Note: You should use present perfect tense.

The provided maps illustrate the stuctual developments that have occured around the Clock Tower Roundabout in Dubai over recent decades Dubai in the past was quite empty and undeveloped ,with only a few houses located along a main road .That ran from northeast and rows of trees originally lined the outer sides of roads leaving […]

The maps show how a public building changed over different periods of time.

The maps illustrate how the layout and function of a public building changed over three periods, from a history reading room to a meeting room and ultimately a theatre. Overall, the building’s footprint expanded considerably at the expense of the garden, which eventually disappeared. The final layout contained a seating area and several supporting rooms, […]

The diagrams show how a district park looked ten years ago and how it looks now .

The two maps illustrate the development of District park, highlighting the key changes that occurred over a 10-year period between 2004 and 2014 Overall, it is clear that the area underwent significant redevelopment, with several new facilities being introduced and some existing features being removed or repurposed. In detail, a new cycling path was constructed […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.