The two maps illustrate the development of an Art Centre, comparing its layout from 2010 to the present day.
Overall, it is apparent that noticeable changes have been made to the arrangement of this venue over the period shown. The main modifications have involved the expansion of the theatre and the relocation of several facilities.
Looking at the two pictures, in 2010, the Art Centre was situated within a square area with an open-air car park opposite the main road. Currently, the open-air car park has been transformed into a multipurpose car park. Additionally, a road has been constructed on the east side to connect the road with the building.
Regarding the other facilities, the theatre in the west has expanded from 200 seats to 300 seats. Looking at the south-east area, the art galleries have been removed, and a bigger art gallery has been built next to the theatre. Additionally, the cafe near the theatre has been expanded. Finally, the cinema on the east side has been relocated to the south side and rebuilt into three cinema rooms.
