The given maps illustrate some changes to Hunderstone Town between the present infrastructure and a future plan for this area.
Overall, the town is projected to experience considerable changes. The most noticeable differences between the two maps are the addition of the roundabout and the main road leading to the town center.
Currently, there is an Art field to the Northwest of the railway, which is predicted to be replaced by an Industrial field. At the same time, from the railway, a footpath leading to the Industrial zone is also likely to be constructed. While the town center, the ring road, and the build-up area are still projected to remain unchanged, there is likely to be a construction of a roundabout connecting the town center to the A2 road in the middle of the railway.
Turning to the other features, we can see that in the future, next to the new round-about a gas station can be built. Meanwhile, the plan also proposes to build a road which links the A4 road to the A2 road to the South of the railway. Additionally, two main roads running to the town center and the A4 road in the exterior of the town are predicted to be constructed in the proposed plan.
