The maps illustrate enhancements a theatre underwent in 2 years.
Overall, significant expansions had taken place, offering various additional conveniences for both audiences and actors. Notably, available space was vastly increased, enabling infrastructures such as showers and a restaurant to be built.
In 2010, the building was undoubtedly marginal, with a cafe on the right and an admin and ticket office on the left of the main entrance. Straight ahead lay rows of seats, right in front of the stage where plays were performed. The corridor beside the stage led to the dressing room behind it and a small storage on the left.
The year 2012 experienced a remarkable growth in the facility’s capacity, evident by a large restaurant replacing the old offices. The cafe was reconstructed into the ticket office, while the admin office was found in front of the restaurant. The old corridor was extended in length, covering the entire back of the stage to the new dressing room and showers on the left of the stage. The storage was enlarged, doubling in size, and moved to the ride side of the building.
