The given maps depict enhancing in the theatre in 2 years.
Overall, significantly expansion was witnessed, providing several convenience improvements for both actors and audience, such as restaurant, showers, and dressing room. Notably, cafe was reconsrtucted in ticket office. Additionally, administrative office was relocated close to the seats sections. Also, corridor was built, and storage room drifted.
In 2010, theatre was obviously smaller, offering boutique cofe, which is locater right in the right corner of the theatre, and also, ticket office was situated next to the administrative in the left-bottom of the theatre. In the middle of the theatre, there was rows of seats in front of stage, where plays were performed. In the background of stage there was dressing room, and storage was in the left of the dressing room.
In 2012, theatre has extended in size and there was constructed some facilities, such as restaurant, which replaced ticket office and administrative. Ticket office was relocated to the right corner of theatre, while administrative was replaced near to seats sections. In addition, in area, where previously was dressing room, was changed to the corridor. Storage was replaced by dressing room and shower, and relocated to the right side.
