The pictures below illustrate differences between a theatre in 2010 and the same theatre after 2 years. Overall, the building became bigger, some new rooms were built.
First of all, near the main entrance there were small cafe on the one side and admin office with ticket offices on the other side. While in 2012 the ticket office moved to the opposite corner and instead of cafe there were constructed a restaurant. In front of the restaurant is admin office.
The auditorium stayed the same size, however the stage in 2012 was wider. In the past behind the stage there was located the dressing room, afterwards this room was redesigned into the corridor, which content the storage and the dressing room, also undernew dress room were situated showers. In 2010 the storage was in the place where in 2012 was the change room.
In conclusion, although the changes are not significant, the modifications enhance the building.
