🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 4+: The maps below show changes in a rural area between 1970 and 2010.

Image for topic: The maps below show changes in a rural area between 1970 and 2010.
Our system will evaluate the answer based on this AI-generated description.
The image displays two maps of a School area for 1970 and 2010. 1970 map: A vertical River bisects the area. West of the river contains a School, a Playing field, Housing with 5 units, and Farmland, with a horizontal road separating the Housing from the Farmland. The area east of the river is also designated as River, with trees. 2010 map: The vertical River remains. West of the river contains a School, a larger Housing area with 12 units, and an Industrial unit, with a horizontal road separating the Housing from the Industrial unit. East of the river contains a Forest and a Football pitch.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

the maps illustrate the changes in a rural area between 1970 and 2010.

It is clear that there were a number of changes in the map, mainly river , playing field and Farmland. By contrast, there were a newly build forest , football pitch and industrial unit.

In 1970, there were School and playing field the north west corner of th map, and next to housing .Howover, there was a river left side corner it place, there was Farmland the bottom on the map.

In 2010, the rive was replaced by a forest and next to newly was created a football pitch, at the same time , the playing field had been removed to make housing and expanded , next , the Farmland had been changed by Industrial the bottom on the map , after that the School was unchanged it’s map.

Word Count: 142

Answers On The Same Topic:

The maps below show changes in a rural area between 1970 and 2010.

The map illustrates how the rural area changed over the 40 year period. At first glance, it is clear that while school and river untouched , the rest of the areas had been changed. Now details, in 1970, school was located in the north-west corner, which stayed in the same location after 40 years later. […]

The maps below show changes in a rural area between 1970 and 2010.

The maps illustrate the changes that took place in the countryside area between 1970 and 2010. Looking from an overall perspective, it is clearly visible that this rural area has witnessed development during this period, while the school and river remained unchanged. To begin with, in 1970, the school was located in the north-west corner, […]

The maps below show changes in a rural area between 1970 and 2010.

The maps demonstrates that the main alterations that have been occurred in rural area from 1970 till 2010. Overall, it is clearly seen that, the rural area was developed over the 40 years, new buildings are erected such as football pitch. In 1970, there are school is remain same but its size is diminished in […]

The maps below show changes in a rural area between 1970 and 2010.

The maps demonstrate the different in a rural area between 1970 and 2010 Overall, there were significant changes in the function of the area. It used to be a farm and in 2010 it became industrial and there were more people lived there. In 1970, school, playing field, housing, and farmland was located on the […]

See All

Other Topics:

The map details the changes that occurred in the town of Shipsmouth in 1995 and 2010.

The map details the changes that occurred in the town of Shipsmouth in 1995 and 2010. Looking from an overall perspective it is readily apparent that the town has become more entertaining with a football stadium, residential with new apartments and skyscrapers, commercial with a pub and shopping center, and accessible with a new airport […]

The maps compare a present layout of the college and future developments to it

The maps show information about the current layout of the college and its proposed changes. Overall, the college is expected to undergo redevelopment, with several new facilities being added, while some buildings will remain unchanged. The most notable additions are labs, a library, a computer room, and a student hall, which will help to enhance […]

The maps compare a present layout of the college and future developments to it

The maps show information about the current layout of the college and its proposed changes. Overall, the college is expected to undergo redevelopment, with several new facilities being added, while some buildings will remain unchanged. The most notable additions are labs, a library, a computer room and student hall which can help to enhance the […]

The maps below show the plan of a small school in 1980 and 2010. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps illustrate the transformation of a small school over the course of three decades, from 1980 to 2010. Overall, the basic layout of this school underwent some significant changes, including the addition of seminar rooms and introduction of amenities catering for the increasing number of students and school staff. These changes came at the […]

The plans below show a college cafe before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

These maps illustrate the layout of a college cafe before its redesign and its current interior. Overall the cafe has been significantly modernized (altered, reconstructed). The changes occurred both outdoor and indoor particularly in serving area staff dining room . In addition they introduced salad bar, barbeque zone and seating areas outside the cafe. Before […]

The plans below show a college cafe before it was redesigned and how it looks now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

These maps illustrate the layout of a college cafe before its redesign and its current interior. Overall the cafe has been significantly modernized. The changes occurred both outdoor and indoor particularly in serving area staff dining room . In addition they introduced salad bar, barbeque zone and seating areas outside the cafe. Before the renovation, […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.