The two maps demonstrate how a small theatre changed from 2010 to 2012.
Overall, the theatre underwent significant transformations, with the expansion of its upper and lower sectors. Additionally, all facilities were either relocated or repurposed except for the auditorium and the stage.
Regarding the top of the theatre, the stage was extended upward , overtaking half of the previous dressing room in 2010, which turned into a corridor two years later. Moreover,there used to be a storage room to the left of the stage but that space had been reposited to the right-handed corner of the plan by 2012, making way for two new rooms, where the performers could take a shower and dress up.
Concerning the remaining parts of the plan, while the auditorium showed no changes, the entrance area below it had been expanded toward the left by 2012. By the end a new restaurant was established, replacing the admin and ticket offices that used to be to the left of the main entrance.However, these rooms were not knocked down, instead the admin office was relocated to the left side of the auditorium and the ticket office replaced the previous cafe at the bottom right corner of the theatre in 2012.
