The plans illustrate the transformation of an office building into a dental clinic.
In general, the building underwent major changes, with office rooms completely replaced by dental treatment rooms.
In the original layout, the office building consisted of a reception area on the left (northwest) side of the entrance, and a storage room on the opposite (southwest) side. After the reception, the next rooms were the kitchen and Office Room 1. There were three office rooms in total, and the owner had planned to build a fourth one. Also, there was a toilet between Office Room 2 and the wall.
After the redevelopment, instead of office rooms, there are now dental treatment rooms. In the area where Office Room 4 was planned on the corner of north side of office building, Treatment Room 2 was eventually built. In the same place where there used to be a toilet, there is now a sterilisation area. The storage area remained unchanged, while a toilet was installed in the same part of the building.
