The two floor plans illustrate how an office building was transformed into a dental clinic.
Overall, the layout was extensively redesigned to accommodate multiple treatment rooms, with office spaces being repurposed and additional medical-specific areas added.
Beginning at the entrance, the reception area remained unchanged. However, the former kitchen and Office 1 were combined to create Treatment Room 1. Office 2 was replaced by Treatment Room 3, while Office 3 and the open-plan office were converted into Treatment Rooms 2 and 4.
The storage room and toilet in the original layout were slightly reconfigured. While the toilet remains in the same position, the area behind it now includes a storage space and a new sterilisation room, which replaced the original toilet location.
This redesign reflects a functional transition from an administrative environment to a healthcare facility, with a focus on maximising treatment space.