The two maps illustrate the main changes in building, which was previously for office, restored to a dental clinic.
Overall, there were a huge developments in changing each room’s purpose. Only one room was added, while others remained the same in location.
As office building there used to be one open planned and three cabinet offices, kitchen, toilet by southern side of office 2 (which was the biggest room) and the storage. The zones of kitchen and office 1 were joined into treatment room 1. The office 2 was replaced with treatment room 3 and second treatment was constructed in the open office place. The last third office was enlarged and converted to treatment room 4.
Storage was reduced in size and in this zone was constructed a new toilet, because the toilet below treatment room 3 was made into sterilization. The only area that remained unchanged in the function was a reception in the western side.
