The maps illustrate how an office building was converted to a dental clinic.
Overall, the removal of the kitchen, an open plan office, and the three main offices made space for new facilities, such as a sterilisation and four main treatment rooms. The storage, the reception, and the toilet remained largely unchanged.
The office featured a three main office rooms and one large open plan office that occupied much of the available space. Upon entering , employees would find the reception to the north, and next to it, there used to be a kitchen. Upon entering, to the south, there was storage, beside there was two buildings; office two and toilet. The main open plan office was situated to the north-eastern side and the office three was near to it to the souht-eastern side.
Later, the layout had undergone significant changes. The elimination of the all three offices, the kitchen, and open plan office made space for a treatment rooms. Furthemore, the storage was shrinked and toilet was relocated near to it. Additionally, instead of the toilet there was added sterilisation.
