The project introduces a model of the southwest airport at the present time as well as future reconstructed and redeveloped plane planes which will be done by next year.
Generally, for the fourth year, chart of airports areas, anticipated significant changes and improvements in some particular areas, and also encouraging into more occupied large airport for population consumption.
Initially, the airfield represented only eight gates for flight which is expected to increase to approximately to 18 gates for several different destinations. According this, instead of using regular walk way between gates planned to modified into convenient sky train for benefit of people. In addition estimates to relocate various shops on security passport control between begging on the gates and departures entrance.
Furthermore, as the check in station-is on right side of the passport control, it is projected to relocate to the opposite side by replacing a coffee shop which will move to the corner of the departures’ hall. Based on this, the previous location of the check-in station was predicted to settle bag drop system as it had not operating before. Finally, the passport control customs department planned to install a cafe and be ATM stand which is estimated to be replaced on the east part above the future car hire shop.
