Our system will evaluate the answer based on this AI-generated description.
The image displays two floor plans for Southeast Airport, labeled "NOW" and "AFTER DEVELOPMENT". The NOW plan shows a Departures section with Check-in, Security, and Passport Control, and an Arrivals section with Passport Control and Customs; it includes one Café in Departures and a walkway to 8 gates (1-8). The legend for NOW lists Check-in, Café, Walkway, and Gates 1-8. The AFTER DEVELOPMENT plan shows a Departures section with Shops, Check-in, Bag drop, Security, and Passport Control, and an Arrivals section with Passport Control, Customs, an ATM, and Car hire; it includes one Café and Shops in Departures, and utilizes a Sky train to access 18 gates (1-18). The legend for AFTER lists Check-in, Bag drop, Café, ATM, Sky train, Car hire, and Gates 1-18.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The plan illustrates how airport looked in present and how it looked after redevelopments in a next year. Overall, it is clear display that there are numbers of facilitis increase after the changes. Also, they will be increasing the number of gates.
In present time, they have only two gates for arrivals and departures but after the changes they will have been contructed new two gates after one year. They have only a cafe shope and check-in department in present time but after redevelopment they will open new cafe shope beside the entrance. Also, ATM machine and car hiring place provied by the airport department. However, control and customer passport security will as it is after the changes.
New airport will looking like Y shape. Before changes people walking them self in that place but after the redevlopment they provied the sky train facility.
There will be big changes display after the renovation is that cafe shope, walkway and gates expanded after redevelopment.
Word Count: 163