The map illustrates the current layout of Southeast Airport and the proposed changes that are expected to take place over the following two years.
Overall, the airport is expected to bring some significant changes included some new facilities like car-hire, bag drop section etc. The walkway will be replaced with a sky train, and the total number of gates will be expanded to eighteen from existing eight.
Initially, looking at the current layout, the departure and arrivals sections are in the southern part of the airport. Inside the departure, there is the check-in on the left side and a cafe in the right side. Right past it, there is the security passport control. Adjacent to that, there is a passport control customs section in the arrivals area. On the northern part, there are a total of 8 gates which are accessible through a walkway.
The redevelopment plan is expected to bring changes. Firstly, in the arrivals section, an ATM will be included along with a second cafe. A car-hire facility will be added on the south-eastern part of the arrival area. On the departure section, the cafe and check-in counter will be swapped locations, and a new bag drop area will be introduced. The walkway will be replaced by a sky train for quick access to the gates. The total number of gates will be expanded to whopping eighteen from eight.
