🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: This is an IELTS writing task 1 sample answer essay on the topic of an airport map's redevelopment in the next year from IELTS Cambridge 16.

Image for topic: This is an IELTS writing task 1 sample answer essay on the topic of an airport map's redevelopment in the next year from IELTS Cambridge 16.
Our system will evaluate the answer based on this AI-generated description.
The image presents two diagrams labeled "Now" and "After Development" for Southwest Airport. In the "Now" diagram, a central terminal is shown with a single walkway connecting departures to arrivals; icons indicate Security at point 1 and 2, followed by Passport Control at point 3 and 4, Customs at point 5 and 6, Check-in at point 7, and Gates at point 8. The "After Development" diagram displays a modified layout with branches leading to multiple points; Check-in stays at point 1 and a new icon for Bag Drop is introduced at point 2, a Café at point 3, an ATM at point 4, a Sky train at point 5, a Car Hire desk at point 6, and multiple Gates spanning points 7 to 16 across three branches.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The maps illustrate the floorplan of an airport in the present time and how it will look after going through major enhancement and expansions next year.

Overall, the airport will be modernized and expanded to accommodate more passengers by adding more gates and a sky train, as well as various selection of facilities as car hire, ATM, and shops.

In the time being, the airport has 8 gates only which can be reached by walking only. The departures area can be accessed by one main door, there is a café and a check-in area before going through the passport control, while there are no shops or cafes in the arrival area after exiting the passport control and customs.

In future plans, the airport will be larger as the number of gates will increase by 10 gates to reach a total of 18 gates divided evenly in two long Y shaped pathways, all gates will be easily accessed and connected by a sky train. A cafe, ATM and car hire will be added to the arrivals area and a bag drop will be added to the departures, therefore enhancing the overall experience of passengers traveling through this airport.

Word Count: 197

Answers On The Same Topic:

This is an IELTS writing task 1 sample answer essay on the topic of an airport map’s redevelopment in the next year from IELTS Cambridge 16.

The plan illustrates the site of the present airport and planned developments to be made over the next year. Overall, considerable expansion and modernisation of the airport are planned. Compared with the previous layout, the walkways will be replaced by SkyTrains, while the number of gates will also sharply increase from 8 to 18. Also, […]

This is an IELTS writing task 1 sample answer essay on the topic of an airport map’s redevelopment in the next year from IELTS Cambridge 16.

The layout prsented on the picture provides overview of the Southwest airport developement plan for the following year. The most noticeable features are extension of the gates area together with the walkway part that is planned be replaced by more modern convey system following to the gates and inclusion of new facilites. Comparing two illustrated […]

This is an IELTS writing task 1 sample answer essay on the topic of an airport map’s redevelopment in the next year from IELTS Cambridge 16.

The provided maps demonstrate how an airport looks like now and its projected layout for the next year. Overall, it is clear that Southwest airport will be expanded, and it will offer far more facilities and it is estimated to change departure and arrival doors. It is interesting to note that the new airport has […]

This is an IELTS writing task 1 sample answer essay on the topic of an airport map’s redevelopment in the next year from IELTS Cambridge 16.

The maps show the plan of Southwest Airport now and how it will look after the redevelopment next year. Overall, the airport will become larger and more modern. The number of gates will increase, and several new facilities will be added, such as shops, ATM and car hire. At the moment, the airport has only […]

See All

Other Topics:

The maps below show the changes that have taken place at Westfield Airport between 1980 and the present day.

The maps illustrate the changes that have taken place at Westfield Airport between 1980 and the present day. Overall, the airport has become more modren and expeanded. In 1980, Westfield Airport had just one terminal and shops and restaurants in the center. Below them, there was a covered walkway, and a car park below it. […]

The map given below shows the plan for reconstruction of the second floor of Mason's Building. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps compare the current layout of the secord floor of Mason’s building and its proposed redevelopment plan. Overall, the floor will be exstensily redesigned from a residential area into a studio. The bathroom and landing will remain unchanges, while all the reamain rooms will be transformed. The kitchen and bedroom 3 will be converted […]

The diagrams below show the plan of a small school in 1980 and in 2010.

The map illustrates the reconstruction of a university department in 1980 and 2010. Overall, it can be seen that the main changes in the size of a university, also some changes in the outside. The university was expanded, instead of three seminar rooms, in 2010 there is five seminar rooms. So, the coridor turned longer […]

The two maps below show an island, before and after the construction of some tourist facilities. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps illustrate the developments that took place on the island. Overall, the major changes took place in the central and western parts of the island, while the eastern side remained unchanged, with the appearance of various tourism facilities. Regarding the map of the original island, the landscape had a length recorded at around 230 […]

The maps give information about the village of Stokeford in 1930 and 2010. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The two maps illustrate how the village of Stokeford changed over an 80-year period from 1930 to 2010. Overall, the village underwent significant redevelopment, with many original features being removed or replaced. More residential and recreational facilities were added, including retirement homes and new housing, while the post office and the bridge remained unchanged. In […]

The maps below show the village of Stokeford in 1930 and in 2010. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The given two maps illustrate how the village of Stokeford changed over an 80 years period from 1930 to 2010. Overall, the village has undergone significant redevelopment, with many original places being removed or replaced. Recreational and more residential facilities have been added, including retirement homes, houses, while the Post office and bridge remain unchanged. […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.