The maps below illustrate the changes in Pebbleton village between 2015 and 2025.
Overall, the village of Pebbleton has become more entertaining with new recreational amenities, residential with new homes, and accessible with new modes of roads. These changes took place at the expense of previously unoccupied lands, and some buildings, while the lighthouse, river, roadbridge, school, old fort and coast roads, lighthouse lane, sea, and natural forest were the features that remained unchanged.
The entertainment places of Pebbleton village have significantly improved. The old fort, where located beside the lighthouse, was replaced as a childrens’ playground now, and a new community center also built between playground and houses. Another entertaining change is that the tennis court was constructed into an empty place in the corner of lighthouse lane and playing field, and the playing field retained similarly.
The village also offers updated road systems. A novel footpath was erected along the tennis court, and playing field. Then the footbridge was built over the river in order to connect the coast road and footpath, whereas the old fort road and roadbridge stayed the same.
Changes in terms of residence also occurred in north and southwest parts of the village. In the north, the number of houses has significantly increased compared to 2015, and novel flats have been built instead of film studios. The lighthouse in the northwest, and school beside the coast road, sea, river, and greenland held steady throughout the periods.
