The two maps indicate the current layout of Bunborough Village as well as its future ambitions. By 2024, the region will have seen significant development overall. New cars will be added to the fleet, and cost-cutting measures will be implemented.
There will be a newly built vehicle by 2024: the train. There will be rails near to the village homes and the Lynwich Path. Two new hotels are also planned. There are two construction sites: one beside the shore and the other above the newly constructed promenade. The businesses will remain the same size and quantity, but the fishing port will disappear.
The two Bunborough Village homes will now be at the summit of Maychester Road. Four other residences will remain unchanged, and one additional house will be built on the newly installed train tracks. Locals will have access to a new source of income: tourism.
