🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: The maps show how the industrial area will change into a housing area in the future. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

Image for topic: The maps show how the industrial area will change into a housing area in the future. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image has two labeled diagrams “Now: Industrial area” and “Future: Area for houses.” The current industrial area includes sections for Parking, Storage, Entrance and Reception, Factory, five Offices, and a Canteen, all located within boundaries defined by a main road on all sides. In the future residential area, there are designated sections for three 2-bedroom houses, one 3-bedroom house, one 4-bedroom house, communal gardens, apartments, parking garages, and a parking area, also surrounded by main roads on all sides.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The maps illustrate how an industrial area will transform into a housing structure before and after renovation.

Overall, many changes had been made, especially in adding new rooms, which made the parking area and apartments.

In more detail, the original industrial area had an entrance/reception and factory on both the north and east sides and parking and storage in the west direction. In the south, there had been a canteen, while the canteen was surrounded by many offices.

In the future, this entrance and reception also included three bedrooms added after redevelopment on the north side, while another additional factory was provided on the east side. Additionally, the parking garage area was introduced on the south side of the house, improving access. The plywood and storage were demolished and included a bedroom house in the future.The parking area and apartments were constructed to connect the town to the nearby highway on the east side.

Word Count: 154

Answers On The Same Topic:

The maps show how the industrial area will change into a housing area in the future. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The provided maps illustrate the current layout of industrial area and the proposal changes into residential area in Overall,industrial area is set to undergo substantial redevelopment,transformaring into housing zone.Some of the most striking changes include construction apartments,houses and parkings. In the current time,most of the area is connected with main road , where there is […]

The maps show how the industrial area will change into a housing area in the future. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The map illustrates changes that are planned to do in the future, how industrial area will change into an area for houses Overall, this industrial area will change complete changes.All facilities that are exist now such as offices, factory, storage and….. will be replaced mainly by facilities that are essential for housing area. To begin […]

The maps show how the industrial area will change into a housing area in the future. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two maps illustrate how particular years of redevelopment will reshape the layout of industrial area. From an overall perspective, the industrial area is expected to undergo significant transformations with the addition of new features like a parking area, apartments, parking garages, communal gardens, and several bedroom houses in place of the factory, offices, storage, […]

The maps show how the industrial area will change into a housing area in the future. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps indicate the planned transformation of the existing industrial zone to a residential area. Overall, this site will undergo complete changes in function, with factories and commercial facilities removed and replaced by varied housing types, expanded green space, and relocated parking facilities. In the current layout, located on the northern edge is the entrance […]

The maps show how the industrial area will change into a housing area in the future. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The map presents information about planned changes to convert an industrial area into a residential neighborhood. Overall, a comparison of the two maps reveals that the city will undergo significant transformations, changing from an industrial zone to a residential region. Currently, the industrial area is surrounded by a main road, which enhances transportation access. A […]

See All

Other Topics:

The plan below shows a hobour in 2000 and how it looks today. Summarise the informarion by selecting and reporting the main features, and make comparisons where relevant

The two maps illustrate how porth harbour has transformed from 2000 to nowadays. Overall, the number of docks has increased and more convenience places have appeared such as cafes, showers and etc. However, the main structure of the harbour has not exprienced any substancial changes. In 2000 the public beach contained only one dock which […]

The following maps show the changes that have taken place in the centre of a town since 1700.

BA 2025 The maps shows the development which took place between 1700 and today in the centre town. There are some significant changes from 1700 to today which include the removal of river and replacing it with a public park. The location for Bigg’s farm has been changed. In addition, shops in 1700 have been […]

The diagram below shows a small local museum and its surroundings in 1957 and 2007. Summarize the information by selecting main features,and make comparisons where relevant

The two maps illustrate information about the changes which took place in the area of small local museum between 1957 and 2007. Overall, the local construction and its surroundings had undergone some changes with new rooms were added and the museum area was expanded. Furthermore, surrounding trees were chopped down while the main road remained […]

The maps below show the plan of a small school in 1980 and 2010. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The map illustrates a school building when it is initially plan in 1980, and how it looks like after 30 years. Overall, the school layout has been updated to include modern facilities which have replaced some natural features. The updates have improved the school accessibility and functionality. The path before the main entrance of the […]

TASK 1: The maps show a present layout of an office building and plans for its future redevelopment.Writing like ielts writing task 1

The map depicts today’s layout of an office building and plans for its future redevelopment. Overall, the proposed plans would include a toilet, meeting area and coffee are in the east side of the office, outdoor seating area on the west side, and more office spaces would be constructed in the office. The grass area […]

The diagram below shows the changes of the town named Shakefield

The maps compare the town of Shakefield in 1995 and at the present time. Overall, Shakefield has become more developed, with a greater focus on tourism and accommodation. Several new facilities have been introduced, while some traditional features have disappeared. In 1995, the coastline was used mainly for fishing activities, with a fish market and […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.