The maps depict the blueprint of current building on Southwest Airport and the reconstruction that will be done on an upcoming year.
Overall, today airport design is more simpler whereas there will be many changes and additionals to the future airport where the most significant developments are a dramatic increase on gates door along with a broader walkway site
First of all, while currently departures and arrivals gates had been divided into 8 gates, it will be added twice to the number it was, from 8 to 18. Further, the check-in counter and café will be relocated as a result of a bag drop facility will be added in the new design along with ATM and car hire on the arrival building which is causing the arrival building being expanded
On the other hand, although the both sites for security, passport control, and customs on departures and arrivals will remained the same as now, later the new shops on departures building will be located before the walkway. As for that, those simple path on this day will be modernised into Y-shaped way as a means of the redevelopment sky
