Our system will evaluate the answer based on this AI-generated description.
The image shows two plans depicting the layout of Southwest Airport currently and post-development. The current layout includes a security checkpoint, passport control and customs, check-in, gateways, a lift and stairs, and a restaurant, labeled 1 to 6 respectively. The arrivals and departures are located below these facilities. The post-development layout shows an expanded setup with 18 labeled facilities including separate domestic and international check-ins, additional restaurants, shops, a business center, a bank, and a car hire. The security and passport control areas are also relocated, and the departure and arrival areas are above the facilities.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The plans illustrates the layout as present condition and after redevelopment of southwest airport.
Overall,it can clearly seen that the airport will expanded many facilities and number of gates in future .
At present, passing through the departures area there is cafe and check_in while after redevelopment of airport there will be bag drop along with cafe and check -in . While in future there is cafe ,ATM and care hire are included after redevelopment .
Comparing to both airport gates will be increased e from 1 to 8 gates in present along with walkway and 1 to 18 in future along with skytrain.
Word Count: 104