The given maps illustrate the refurbishment of a health center according to plans A and B in two separate years (2005 and the present day).
Overall, it is evident from the maps that there are the majority of alterations available in the hospital over the period. Notably, the area has developed by adding some new facilities to expand.
Examining the data in more detail, in 2005, main entrance and two ladders were located in the bottom of the area, followed by car parking spaces accounted for 12. In the middle of the map reception desk was established, and adjust to seats, also, left hand side of the building office was settled up. There were three consultation rooms around the construction, a garden center was situated in the outside. The physiotherapy room was built behind the desk.
When it comes to the refurbishment of the building in the present day, garden, office and physiotherapy room have not been changed, in contrast, reception desk and seats are transferred to another side. Car parking has comprised about 30 spots, increasing the number of vacant spaces. The entrance is converted into the left hand side, and minor operations room and children’s play area have newly erected, with the former next to the physiotherapy room and the latter in the corner of the hospital. The sides of the consultation rooms are changed around the health care center.
