🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: Summarise the changes to Liverpool John Moores university from 2010 to 2016

Image for topic: Summarise the changes to Liverpool John Moores university from 2010 to 2016
Our system will evaluate the answer based on this AI-generated description.
The image contains two campus maps showing changes to Liverpool John Moores University from 2010 to 2016. The 2010 map includes buildings labeled as Library, Biology, Chemistry, Physics, Car Park, Admin Building, and a road connecting the Car Park and Admin Building. The 2016 map features a Library & IT Suite, Science building, Footpath, Cafe, Lecture Theatre, Admin Building, and a Bus Station with no labeled road. Notably, the Car Park and individual science buildings visible in 2010 are absent in 2016, replaced by a singular Science building and additional facilities like the Cafe and Lecture Theatre.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The maps describe how the campus of Liverpool John Moores University was restructured over a period of 6 years, starting from 2010.

Overall, following some changes, the campus now offered a greater range of facilities. It is also worth noting that while the area was initially accessible by car, it became only reachable by public transportation after the campus reconstruction.

In 2010, the university campus had a relatively limited range of facilities. The main features of the area were three science buildings in the north designated for Biology, Physics, and Chemistry. The university library could be found to the west of these buildings while the administration building was situated in the south-east. All these facilities could be accessed by road links with roundabouts at three points. Moreover, two public parking lots were available – one across the admin building and the other further north.

By 2016, the campus had undergone a complete makeover. The most noticeable change was the merger of three science buildings into one. Additionally, an IT suite had been incorporated into the library for university use, and the library now overlooked a newly-built cafe to its south. The parking lot north of the admin building was removed to make way for a new lecture theatre while the other one was repurposed into a bus station. Last but not least, a new footpath was paved in place of the road links, making the campus a traffic-free area.

Word Count: 239

Answers On The Same Topic:

Summarise the changes to Liverpool John Moores university from 2010 to 2016

The maps provide a detailed comparison of the structural and functional changes that have taken place at Liverpool John Moore’s University between 2010 and the present day. Overall, the campus has undergone major modernization with new facilities and upgraded academic areas; however, several original buildings and road systems have been removed to create a more […]

Summarise the changes to Liverpool John Moores university from 2010 to 2016

The maps give detailed information about changes taking place in Liverpool John Moores University between 2010 and 2016. Overall, it is clear that there was a dramatic change in the structure of the University, particularly in the development of the café and Lecture Theatre. It is also worth mentioning that Admin Building and the Library […]

Summarise the changes to Liverpool John Moores university from 2010 to 2016

The plans give detailed information about changes taking place in Liverpool John Moores University in the years 2010 and 2016. Overall, it is clear that there was a dramatic change in the structure of whole university, particularly in the development educational blocks and additional cafe. It is also worth mentioning that only admin building remained […]

Summarise the changes to Liverpool John Moores university from 2010 to 2016

The layouts illustrate transformations that had taken place from 2010 to 2016 in the Liverpool John Moores University. Overall, although the university underwent significant modifications in the footpath, the admin building and library remained the same. Additionally, several buildings where formerly used as differents sience faculties, merged into only one building. Moreover, while lecture theatre, […]

Summarise the changes to Liverpool John Moores university from 2010 to 2016

The map gives detailed information about changes taking place in Liverpool John Moores University between 2010 and 2016. Overall, it is clear that there was a dramatic change in the structure of the university, particularly in the development of science buildings and the bus station. It is also worth mentioning that the Admin building remained […]

See All

Other Topics:

The plan below show the site of an airport now and how it will look after redevelopment next year. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The plan describes the how the southwest airport will look after it undergoes development. The current plan, shows a simple look of the current airport with just a few features which will undergo a notable expansion to a modern and more developed look. Below are the highlighted changes that will occur. The number of gates […]

The map below shows the plan of a proposed new town. Summarise the information by selecting and reporting the main features, and make comparison where relevant.

The map shows the idea of constructing a new town. Overall, it is clear that the town has transformed significantly, with the development of several : roads, housing, parking and bus stands. The industry is located in north and in the south corner. There is a ring road in the middle of the town, and […]

The two maps below show a housing estate as it is now and how it will look after redevelopment.

The two maps illustrate the now status and the planning for the future development housing estate Overall, the area is covered by woodland and the housing distribution is sparse while the planning for the house shows that these areas are planning to position the layout of these houses. The forest are clear and replaced by […]

The plans below show the layout of a town called Sholeaton in 1985 and in 2015.

The two maps compare the layout of a town called Sholeaton in 1985 and how it had changed in 2015. Overall, the town had undergone remarkable developments. The most noticeable transformations were in transport infrastructure and commercial facilities. One of the most striking changes was road system. To be more specific, there was the addition […]

The plans below show the site of a farm in 1950 and the same site today. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The map illustrates the differences between Beechwood farm in 1950 and how it looks today. Overall, the farm has been modernized by adding newly constructed facilities and improving infrastructure. It is obvious that most of the changes were in the eastern part of the territory. First, there was a sheep field in the north, which […]

The two plans below show a bookstore in 2000 and the bookstore now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The two plans illustrate how much bookshops developed from 2000 to the present. Overall, bookstores have not added any new types of books, but have added Cafe counter and three tables where people can sat and ate their food or just chill and read their book. Also placements of bookshelves have changed. In 2000, store […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.