24 Hours Only: Get 39% OFF on Our Premium Plan - Check Out Now!
Map

Band 6+: Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

Image for topic: Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image shows two maps depicting Norbiton industrial area currently and its planned future development; the current map features a central roundabout with junctions leading to a factory southeast, additionally spread-out factories are throughout, with farmland northeast, two branching roads, and empty land near the central roundabout; the future development map shows central roundabout additions including exits north to school, east to playground, and west to housing; the existing factory south converts to a medical center; additional junctions and roundabouts extend to housing to the south and east, shops northwest, school north, playground east, medical center south, and farmland transforming into housing in the northeast.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The map on the top shows current industrial zone in the town of Norbiton, while the other map shows the plan of development of this region. It’s obvious that there will be significant changes, including a construction of a new school building, medical Centre, playground, housings and several more roads.

The intersection between the north road and a circular road will be turned into a round a-bout and there will be a new hospital to the north-east of the circular road. New shops will be opened to the west of the circular road and near that will be constructed a new roadway that will lead to two new accommodations. There will be a new school structure at the end of the road that is to the east of the big round a-bout. There will also be a new playground and apartments at the center of the same road. Factories surrounding the circular road will be demolished in order to make way for apartments and new roads. The new apartment will be built on the north of the river and it will be connected to the main round a-bout with a new bridge and a straight road. The west of the region remains same, with no significant change in the town.

In conclusion, there will be huge changes in the industrial zone in order to connect all of the apartments that will be built and increase the standards of living.

Word Count: 239

Answers On The Same Topic:

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The map above illustrates an industrial area in the town of Norbiton from the present to the future plan of refurbishment that will happen. Overall, the map indicates that the future development will expand the roads and the amenities around town. From the map of the present, it shows the road by the lake is […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The two maps illustrate the industrial region of Norbiton town, as it is now and the development plans for the future. Overall, it can be observed that industrial site will be replaced with housing area and redevelopment of some amenities, such as shops, a medical centre, a playground, and a school for public convenience. Currently, […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The figures illustrate a Norbition undustrial site now and its forthcoming changes. Overall, the area is planned to have factories replaced with housings. Moreover, it may be expected to turn into a place full of new facilities for people. Now, the industrial area has two main roads connected in the center of the town. There […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The two maps depict the town of Norbiton industrial area at present, and proposed future plan for improvement. Overall, industrial buildings will be expected to change houses. It can be seen from the maps, several facilities will be offered to build like recreational area, educational center and the infrastructure of the city will be developed. […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The New Design of the industrial area for the future is planned in the town of Norbiton in the given maps. The expansion of the region depicts that industrial sector will be replaced by residential area, moreover some facilities including school, playground, hospital are also added for convenience. Firstly, industrial units are substituted with local […]

See All

Other Topics:

The maps show the changes that have taken place at an Australian Zoo between 1960 and now. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The maps illustrate how a zoo layout was transformed over time, from 1960 to the present day. Overall, the zoo has undergone substantial modernization, becoming more accessible over time. These changes were mainly achieved through the improvement of its transportation infrastructure, as well as significant changes to the animal closures. Initially, the zoo was bordered […]

You should spend about 20 minutes on this task. The maps below show an industrial area in the town of Norbiton, and planned future development of the site. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps illustrate the present industrial area and its proposed future layout in the town of Norbiton. Overall, the town win experience several changes, especially in terms of road systems and some replacements. The most noticeable changes are the removal of factories and some new constructions. At present, the town has only one ring road […]

The maps below shows the layout of a public park in 2010 and the same park now

The maps below illustrate the design of a public park in 2010 and now. Overall, a significant changes are shown in the entire location of park, however only the location of entrance stays the same. The park was sorrounded by fences. In the middle of the park there was a fountain, then it was transformed […]

The maps below show an industrial area in the town of Norbiton , and planned future development of the site

The maps show an industrial area in Norbiton now and how it will look in the future. Overall, the area will change a lot. It will become a place for living, with houses, a school, and shops instead of factories. At present, there are many factories in the area. They are built around a roundabout […]

The diagrams give information about changes in a student accommodation. Summarize the information by selecting and reporting the main features, and make comparisons where relevant.

The diagrams illustrate the notable alterations in student accommodation design between 2010 and the present day. Overall, the student living space has been extensively restructured to accommodate additional dormitory facilities and essential amenities. In the upper section of the accommodation, the previous living room and the garden area to its left have been reconfigured to […]

Describe a Map of the Museum in 1998 and 2008

The map illustrates how the construction of the museum evolved between 1998 and 2008. Overall, there were more changes in the map than the unchanged ones as the permanent exhibition rooms on the west side was relocated on the bottom of the east side while the facilities which were formally in that position was spread […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
279,000₫ 157,000 ₫ cho gói 1 tháng (chỉ 5,233₫/ngày)
819,000₫ 397,000 ₫ cho gói 3 tháng (chỉ 4,411₫/ngày)
1,649,000₫ 667,000 ₫ cho gói 6 tháng (chỉ 3,706₫/ngày)
3,299,000₫ 857,000 ₫ cho gói 12 tháng (chỉ 2,381₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.