The provided maps illustrate the change of the layout of the conference centre in 2010 and 2025.
Overall, the two room, which were located in the northwest in 2010, will remain in 2025. Additionally, the garden, which was located in the east in 2010, will be destroyed and replaced by the car park in 2025.
Looing at the given maps, the two room, which were located in the northwest in 2010, will remain in 2025. Besides, the hall, which was located in the north in 2010, will remain and wider in 2025. The reception, which was located next to rooms, will remain in 2025. The car park, which was located on the right side of hall in 2010, will be destroyed in 2025. In addition, the residence hall (20 rooms), which will be located in the northeast, will be build in 2025. The garden, which was located in the east in 2010, will be destroyed and replaced by the car park in 2025.
Additionally, the garden, which was located in the west in 2010, will remain and wider in 2025. Besides, the IT centre, which will be located in the southwest, will be build in 2025. The canteen and kitchen, which will be located on the right side of IT centre, will be build in 2025. In addition, the two meeting room, which will be located next to the canteen and kitchen, will be build in 2025. The game room and music room, which will be located in the south, will be build in 2025.
