The given diagram show information about 2 underground road in 2 cities in Australia
Overall, the road in the first map costs less money than the second road, but the first road uses more time to build. Additionally , the latter road was bigger than the former
To begin with , the first road tunnel was built between 1986 and 1998 and this road wastes less money to build with around 555$ millions , while the other road was built from 2002 to 2006 . In addition, money spent on the latter building is two times as high as the first one with 1.1$ billions. The second tunnels have 6 lanes compared to the first road having 4 lanes
Look at the picture for more details , the first road was built under a bridge and sand and the former road high 1,5 metres and 2,2 kilimetres length .compared to the others built under a city and lots of infrastructure and the second road longer ang higher than the first road with 3,6 kilometres and 2,5 metres
